PERFORMANCE VALUES

Nozzle Diameter : 1027 mm
Pressure :
Capacity :
Jet Length :
Irrigated Area :

A sprinkler which rotates in a full-circle or in the range of angle settings you make when required, medium pressure. With its replaceable nozzles and moving water-breaking system, it enables you to irrigate your field with an excellent and uniform water distribution. It rotates in a full circle and semicircle at same speed. It is suitable for any use, agricultural or industrial. It has single-hole nozzle of new type. As it is, it operates with less water, minimizing problem of nozzle-clogging arising from waste water. Furthermore, it is also equipped with water pipe with specially designed vanes to prevent turbulence and rubber nozzle which stretches and expands when clogging. It has special paint of new type and it is much more durable against environmental factors thanks to new type powder paint. With its single-hole nozzle construction, adjustable moving water-breaker and body of 25o, this version is also conveniently used for any kind of agricultural application, discharge of waste water in the industry; evaporation of lakes and swamps and for dust suppression and similar industrial applications. Thanks to non-clogging nozzle section, it is very appropriate for use on travelling irrigators. 

Range of Usable Nozzle Diameter
14 mm – 24 mm

Range of water consumption
13 m3/h – 57 m3/h

Range of Shooting
24meter– 50meter

Body Angle
25° 

TECHNICAL SPECIFICATIONS

Nozzle DiameterPressureJet LengthCapacityValues for a single sprinkler
Irrigated AreaRainfall per hour
mminchkg/cm2lbs/inchmfeetl/minm3/hG.P.Mm2acremm/h
14 0,55 2,5 37 24 79 220 13,2 58 1808 0,45 7,3
14 0,55 3 44 26 85 233,3 14 62 2122 0,52 6,6
14 0,55 4 56 29 95 270 16,2 71 2640 0,65 6,1
16 0,62 2 29 26 85 241,7 14,5 64 2122 0,52 6,8
16 0,62 3 44 29 95 296,7 17,8 78 2640 0,65 6,7
16 0,62 4 56 31 100 341,7 20,5 90 2920 0,72 7,0
16 0,62 5 70 33 108 386,7 23,2 102 3419 0,84 6,8
18 0,70 3 44 32 105 375 22,5 99 3215 0,79 7,0
18 0,70 4 56 35 115 438,3 26,3 116 3846 0,95 6,8
18 0,70 5 70 37 121 470 28,2 124 4298 1,06 6,6
18 0,70 6 85 40 131 521,7 31,3 138 5024 1,24 6,2
20 0,78 3 44 35 115 445 26,7 118 2846 0,95 6,9
20 0,78 4 56 37 121 536,7 32,2 142 4298 1,06 7,5
20 0,78 5 70 42 138 591,7 35,5 156 5538 1,37 6,4
22 0,86 3 44 35 115 556,7 33,4 147 3846 0,95 8,7
22 0,86 4 56 37 121 641,7 38,5 170 4298 1,06 9,0
22 0,86 5 70 40 131 716,7 43 189 5024 1,24 8,6
22 0,86 6 85 42 138 786,7 47,2 208 5538 1,37 8,5
24 0,94 4 56 43 141 771,7 46,3 204 5805 1,43 8,0
24 0,94 5 70 45 148 801,7 48,1 212 6358 1,57 7,6
24 0,94 6 85 47 154 885 53,1 234 6936 1,71 7,7

EVENTS

01 February 2017
THESSALONIKI-GREECE
Continue
21 February 2018
PLOVDIV-BULGARIA
Continue
11 April 2018
MALATYA- TURKEY
Continue
30 April 2018
RIBEIRAO PRETO-BRASIL
Continue
08 May 2018
TEL AVIV-ISRAEL
Continue
13 June 2018
SYDNEY - AUSTRALIA
Continue
25 July 2018
JAKARTA-INDONESIA
Continue
22 August 2018
BANGKOK-TAYLAND
Continue
07 November 2018
BOLOGNA-ITALY
Continue